Authority Convergence

Authority convergence is the gate that says: when a packet touches authority / spec / redesign surfaces, an independent audit must record PASS before implementation dispatch. This is the methodology's structural guarantee against AI-authored spec drift.

What The Gate Triggers On

TriggerMatch condition
packet_kindauthority, spec, redesign, or preflight
ref_prefix.nimi/spec/
topic.work_typeredesign

If any of these match, the gate fires. An independent auditor PASS must precede worker dispatch.

Required Result

FieldValue
result_kindaudit
verdictPASS (the only admitted pass verdict)

NEEDS_REVISION and FAIL are blocked verdicts. Worker dispatch does not happen until the verdict moves to PASS.

Post-Update Review

After implementation lands, a follow-up judgement PASS is required before mechanical phase transition.

FieldValue
result_kindjudgement
verdictPASS

The post-implementation review is a separate gate from the pre-implementation audit. Both must pass.

Why The Two-Gate Pattern

Pre-implementation audit catches:

  • Drift in the proposed change (does the spec edit make sense?)
  • Hidden authority shifts (is canonical truth being moved?)
  • Forbidden patterns in the planned approach.

Post-implementation judgement catches:

  • Drift between plan and execution (did the worker do what was planned?)
  • Implementation-side patterns the pre-audit could not see (a shortcut introduced during execution).
  • Final closure verification across the four dimensions.

A single gate catches half. Two gates catch both halves.

Hard Constraints

ConstraintWhat it forbids
Auditor output is candidate evidence onlyAuditor cannot self-admit
Manager records audit result before implementation dispatchManager cannot skip the record step
Unresolved blocking findings fail closedCannot wave away a blocker
Deferred items must be explicitly non-blockingCannot push blockers into "later" silently
Concrete subagent mechanics belong to adapter profiles, not methodology semanticsMethodology stays host-agnostic

The last constraint is the host-agnostic principle: how the audit gets routed to a different AI session is an adapter concern, not a methodology concern.

Reader Scenario: A Spec Edit Without Pre-Audit

A worker tries to dispatch a packet that edits .nimi/spec/ without a pre-implementation audit on record.

  1. Manager evaluates dispatch. Authority convergence gate fires.
  2. Audit lookup. Gate checks for recorded result_kind: audit with verdict: PASS.
  3. Not found. No audit on record for this packet.
  4. Refuse dispatch. Worker is not dispatched.
  5. Path forward. Run pre-implementation audit; record PASS; resubmit dispatch.

There is no skip. The gate is structural.

Reader Scenario: A Pre-Audit Returns NEEDS_REVISION

A pre-implementation audit runs and returns NEEDS_REVISION with specific findings.

  1. Audit recorded. result_kind: audit, verdict: NEEDS_REVISION.
  2. Findings noted. Specific drift / forbidden-pattern issues.
  3. Worker dispatch refused. NEEDS_REVISION is a blocked verdict.
  4. Manager addresses findings. Either revise the packet (new forbidden_shortcuts, narrower scope, etc.) or resolve the underlying issue (admit a missing prerequisite).
  5. Re-audit. New pre-audit run; if PASS this time, dispatch.

The findings drive the next packet revision. There is no "audit said no but we'll proceed" path.

Reader Scenario: Post-Implementation Judgement Catches Drift

Implementation lands. Pre-audit PASS was recorded. Worker said "done."

  1. Post-implementation judgement. Independent loop reviews the actual work.
  2. Drift detected. Worker introduced a dual_read pattern that pre-audit could not have foreseen.
  3. Verdict. judgement: NEEDS_REVISION.
  4. Wave returns to revision. Cannot advance to mechanical phase transition until judgement is PASS.
  5. Worker addresses. Removes the dual_read, re-submits.
  6. Re-judgement PASS. Now the wave can advance.

Implementation-side drift gets caught because the post-audit is its own gate.

Reader Scenario: A Spec Update Review Gate

A packet that successfully implements a spec change has both pre-audit PASS and post-judgement PASS recorded. Mechanical phase transition would normally proceed.

But there's a special rule: post-spec-update review is the exception to mechanical phase transition continuation. After a spec / authority / redesign implementation PASS, run-next-step must use require_human_confirmation with reason code spec_update_review_required until a fresh judgement PASS is recorded.

This exists because spec changes are consequential enough that even mechanically-clean implementations get a human-confirmation gate before the next phase moves.

Boundary Summary

ConcernOwner
Pre-implementation auditIndependent auditor
Audit result recordingManager
Worker dispatch decisionManager (after audit PASS)
Post-implementation judgementIndependent auditor
Mechanical phase transitionManager (after judgement PASS, with spec-update review gate)

Source Basis

Nimi AI open world platform documentation.